• Version
  • Download 13
  • File Size 159.25 KB
  • File Count 1
  • Create Date November 30, 2020
  • Last Updated August 28, 2023

TekniPlex flow wrap structure eliminates $250K in manufacturing costs

These issues were eliminated:

  • Approximately $150K in wasted material annually 100 plus hours annually of downtime
  • $30 to $35K in annual labor costs to address the problem
  • $250K direct manufacturing costs
  • $100K in lost product output annually

Attached Files

File
4964_Tekni_Healthcare_Flow-Wrap-Case-Study_8.21.23_PRINT.pdf